Two trips to moab after 3" lift = one new centerlink for me.
I am fortunate enough to be able to design, build and test my own steering system. I should have it completed within the next two months unless I am too busy painting. If I am too busy painting then that means I'll be able to afford the SLR unit, which BTW looks to be very strong and well built.
I have access to all of the equipment and materials necessary to build a durable and safe unit. It will not however be for sale to the public, I have no desire to get into the fabrication buisness.
_________________________
Todd K.
Got paint?