Well, here's the update. Left to do: bleed brake lines, reinstall front / rear sway bars, install bump stops, install skid plates... deflate tires lots and lots and roll out of garage. Alignment on Monday.

I have lots of good tips, and feel very good about the install. The product is well designed and made, the skill level for the install is somewhat technical but not overwhelming. Given the temps I have had to work with I think I have done ok, but it has been almost 2 weeks. Total hours however have been about 15 hours with some of those being spent on trial and error - hence the emphasis on tips.

I will do a formal write up after I'm done and drive it.

Sorry its taken a while, its still cold out there... my toes, knees and booty can attest to that!
_________________________
KE7AEY
Those damn voices in my head... gotta get DIRT!