Can you believe I was getting paid for this? Had to spend half the day in a quarry making sure the contaminated soil treatment facility I designed was being built to spec (lots o mud laugh ).......then I had to take a run down a local transmission line to check on a site [Wave] .....all on a hot and sunny friday afternoon!!!!!