Well,

The ARB shipment came in.......

My X goes in tommorrow morning for the installation of the rear locker. I've built a platform in the engine bay for the compressor, removed the ashtray and fabricated a new switch panel (version 1) for the switches. I may run out this evening and purchase some 3/8" fuel line hose to protect the ARB blue line.

Hopefully everything will be set to go in less than 36 hours.

Todd
_________________________
First Xterra IFS or SAS up Moab Rim...#2 up Mt. Blanca.
African Adventure pictures....
http://homepage.mac.com/ahlenius/