Not to hijack the thread, but I will. smile

http://jbeamphotos.com/gallery/Xterra_Mods_LowerProtection

That are some progressive pics from when I Herculined the rockers and lower doors last year. Total work took about 4 hours and it took a solid day to dry.

What it looks like now.


BTW, That is AC front Coils, AC Rear Shackles, Calmini AAL kit, AC extended brake lines, Bilstein rear shocks (long travel / 20% stiffer). The tires are 285/75R16 BFG MT's.